Digital Times Nigeria
  • Home
  • Telecoms
    • Broadband
  • Business
    • Banking
    • Finance
  • Editorial
    • Opinion
    • Big Story
  • TechExtra
    • Fintech
    • Innovation
  • Interview
  • Media
    • Social
    • Broadcasting
Facebook X (Twitter) Instagram
Trending
  • New Report Flags Deepfakes, AI Disinformation As Major Risks To Nigeria’s 2027 Elections
  • NCC, Tecno, Hyperspace, Digital Realty Rally Behind NITRA Innovative & Scientific Conference
  • Abia Attracts $145m Solar Manufacturing Investment As Project Reaches Final Decision Stage
  • Fidelity Bank Improves Learning, Living Conditions At Lagos Orphanage
  • Union Bank Reinforces Sustainability Drive With Lekki Beach Cleanup
  • New NIMC Act Gets Major Boost As NITDA Hands Over PKI Framework For Secure Digital Identity
  • FAAN Set To Transform Domestic Air Travel With V-Pass Facial Recognition System
  • Stakeholders Back NCC’s Zero-Rated Education Initiative
Facebook X (Twitter) Instagram
Digital Times NigeriaDigital Times Nigeria
  • Home
  • Telecoms
    • Broadband
  • Business
    • Banking
    • Finance
  • Editorial
    • Opinion
    • Big Story
  • TechExtra
    • Fintech
    • Innovation
  • Interview
  • Media
    • Social
    • Broadcasting
Digital Times Nigeria
Home » NERC Grants Permits To MTN, Others To Generate Electricity
ENERGY

NERC Grants Permits To MTN, Others To Generate Electricity

DigitalTimesNGBy DigitalTimesNG19 August 2024No Comments2 Mins Read75 Views
Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
NERC
Electricity generation
Share
Facebook Twitter LinkedIn Pinterest Telegram Email WhatsApp

News Highlights:

  • The Nigerian Electricity Regulatory Commission (NERC) issued nine new off-grid generation licenses in Q1 2024, totaling 109.69 megawatts.
  • NERC is actively promoting renewable energy and mini-grid development by issuing permits and registration certificates to various companies.

The Nigerian Electricity Regulatory Commission (NERC) has issued permits to MTN Communications Nigeria Limited, Golden Penny Power Limited, Havenhill Synergy, and others for mini-grid electricity generation.

NERC said it issued nine new off-grid generation licences in the first quarter of 2024 with a gross capacity of 109.69 megawatts and three new trading licences, according to a report by The PUNCH.

The commission said in a report that Golden Penny Power Limited got a licence to build six off-grid gas plants in Lagos, Oyo, Ogun, and Cross River states. The total capacity is 100MW.

MTN was permitted to build four captive generation plants across Lagos State with 15.94MW capacity.

Aside from MTN, SweetCo Foods Limited, African Steel Mills Nigeria Limited, West African Ceramics Limited, Royal Engineered Stones Limited, and Armilo Plastics Limited were permitted to generate captive power.

Captive power generation permits are issued to entities that aim to own and maintain power plants for generating power for consumption and not for sale to a third party.

The commission issued nine captive power generation permits in 2024/Q1 with a total nameplate capacity of 52.57MW.

The PUNCH gathered that other licensed companies for mini-grids are Daybreak Power Solutions, TIS Renewable Energy Limited, Auro Nigeria Private Limited, Watts Exchange Limited, Centum Dopemu Energy Services Ltd, DMD Electric Limited Lagos State.

Section 165(1)(m) of the Electricity Act 2023 permits the commission to award licence of mini-grid concessions to renewable energy companies to exclusively serve a specific geographical location indicating aggregate electricity to be generated and distributed from a site with the obligation to serve customers to request service.

READ ALSO  Major Fault On Omotoso-Ikeja Transmission Line Cause Of Lagos Power Supply Drop- TCN

Under this, the commission said it has continued to encourage the development and utilisation of renewable energy by issuing permits and registration certificates for mini-grid development.

A permit is issued to a mini-grid developer for the construction, operation, maintenance, and where applicable ownership of mini-grids with distribution capacity above 100 kilowatts and generation capacity up to 1MW.

The commission disclosed that it issues registration certificates to a mini-grid developer for one or more systems with distribution capacity below 100kW.

Source: The PUNCH

#Electricity #MTN #NERC
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleKonga Back-To-School Goes Live Today
Next Article Access Bank Customers To Enjoy 12% Discount On Qatar Airways’ Business, Economy Class Tickets
DigitalTimesNG
  • X (Twitter)

Comments are closed.

Categories
About
About

Digital Times Nigeria (www.digitaltimesng.com) is an online technology publication of Digital Times Media Services.

Facebook X (Twitter) Instagram
Latest Posts

New Report Flags Deepfakes, AI Disinformation As Major Risks To Nigeria’s 2027 Elections

17 July 2026

NCC, Tecno, Hyperspace, Digital Realty Rally Behind NITRA Innovative & Scientific Conference

17 July 2026

Abia Attracts $145m Solar Manufacturing Investment As Project Reaches Final Decision Stage

17 July 2026
Popular Posts

Building Explainable AI (XAI) Dashboards For Non-Technical Stakeholders

2 May 2022

Building Ethical AI Starts With People: How Gabriel Ayodele Is Engineering Trust Through Mentorship

8 January 2024

Gabriel Tosin Ayodele: Leading AI-Powered Innovation In Web3

8 November 2022
© 2026 Digital Times NG.
  • Advert Rate
  • Terms of Use
  • Advertisement
  • Private Policy
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.