Digital Times Nigeria
  • Home
  • Telecoms
    • Broadband
  • Business
    • Banking
    • Finance
  • Editorial
    • Opinion
    • Big Story
  • TechExtra
    • Fintech
    • Innovation
  • Interview
  • Media
    • Social
    • Broadcasting
Facebook X (Twitter) Instagram
Trending
  • Becoming GOCOP: The Story, By Ken Ugbechie
  • IABC Africa Elects First Nigerian To Serve As Chair
  • Konga Celebrates 13 Years Of Innovation With Explosive Yafun Yafun Deals’ Anniversary Sale
  • Instagram Strengthens Teen Safety Features, Empowers Parents With New Tools
  • NerdzFactory, Meta Boost Digital Safety For Nigerian Youths, Expand ‘Safe Online’ Campaign
  • Anambra Offers Free WiFi At Solution Fun City Grand Opening To Drive Digital Inclusion
  • QNET Wraps Up V-Malaysia 2025 With Over 8,000 Global Participants In Penang
  • NITDA Unveils Digital Competence Framework To Curb ‘Japa’ Syndrome In Nigeria’s Public Sector
Facebook X (Twitter) Instagram
Digital Times NigeriaDigital Times Nigeria
  • Home
  • Telecoms
    • Broadband
  • Business
    • Banking
    • Finance
  • Editorial
    • Opinion
    • Big Story
  • TechExtra
    • Fintech
    • Innovation
  • Interview
  • Media
    • Social
    • Broadcasting
Digital Times Nigeria
Home » Major Fault On Omotoso-Ikeja Transmission Line Cause Of Lagos Power Supply Drop- TCN
ENERGY

Major Fault On Omotoso-Ikeja Transmission Line Cause Of Lagos Power Supply Drop- TCN

Our REPORTERBy Our REPORTER12 March 2025No Comments1 Min Read138 Views
Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
Power supply
Share
Facebook Twitter LinkedIn Pinterest Telegram Email WhatsApp

The Transmission Company of Nigeria (TCN) has confirmed a significant reduction in electricity supply to Lagos following a major fault on its Omotoso-Ikeja West 330-kilovolt (kV) transmission line.

In a statement on Tuesday, TCN’s General Manager of Public Affairs, Ndidi Mbah, disclosed that the transmission line snapped between towers 420 and 422 on March 9, leading to a loss of approximately 350 megawatts (MW) of bulk electricity supply to the state.

The outage has impacted both Eko Electricity Distribution Company (EKEDC) and Ikeja Electricity Distribution Company (IKEDC), resulting in widespread load shedding across their franchise areas.

To address the situation, TCN has dispatched engineers to the site and mobilized necessary materials for repairs.

According to Mbah, the restoration process is expected to be completed within three days, after which full bulk power supply will resume through the affected transmission route.

Mbah apologized for the inconvenience caused to the government, electricity distribution companies, and consumers in Lagos, assuring them of TCN’s commitment to resolving the issue as swiftly as possible.

READ ALSO  Tinubu Sacks NNPCL CEO Kyari, Board, Names Ojulari As New CEO
#Electricity #Power Supply #TCN
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleSeplat Energy, Zinox Technologies In Strategic Tech Partnership
Next Article Customs’ B’Odogwu Platform Generates Over N150 Billion In Four Months- Compt. Daniyan
Our REPORTER
  • Website

Related Posts

Femi Soneye Steps Down As NNPCL Spokesperson

22 June 2025

Archaea Energy Selects AVEVA For Its Renewable Natural Gas Projects

9 April 2025

TD Africa, EcoFlow Launch Eco-Friendly Power Solutions

5 April 2025

NNPCL Welcomes New GCEO Ojulari, Appreciates Kyari’s Leadership

2 April 2025

China To Launch Grid-Connected Electric Vehicle Projects To Strengthen Power Supply

2 April 2025

Tinubu Sacks NNPCL CEO Kyari, Board, Names Ojulari As New CEO

2 April 2025

Comments are closed.

Categories
About
About

Digital Times Nigeria (www.digitaltimesng.com) is an online technology publication of Digital Times Media Services.

Facebook X (Twitter) Instagram
Latest Posts

Becoming GOCOP: The Story, By Ken Ugbechie

1 July 2025

IABC Africa Elects First Nigerian To Serve As Chair

1 July 2025

Konga Celebrates 13 Years Of Innovation With Explosive Yafun Yafun Deals’ Anniversary Sale

1 July 2025
Popular Posts

Building Explainable AI (XAI) Dashboards For Non-Technical Stakeholders

2 May 2022

Building Ethical AI Starts With People: How Gabriel Ayodele Is Engineering Trust Through Mentorship

8 January 2024

Gabriel Tosin Ayodele: Leading AI-Powered Innovation In Web3

8 November 2022
© 2025 Digital Times NG. Designed by Max Excellence LLC.
  • Advert Rate
  • Terms of Use
  • Advertisement
  • Private Policy
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.