Digital Times Nigeria
  • Home
  • Telecoms
    • Broadband
  • Business
    • Banking
    • Finance
  • Editorial
    • Opinion
    • Big Story
  • TechExtra
    • Fintech
    • Innovation
  • Interview
  • Media
    • Social
    • Broadcasting
Facebook X (Twitter) Instagram
Trending
  • PalmPay Wins Digital Payments Platform Of The Year At 2026 BAFI Awards
  • Shareholders Commend Fidelity Bank’s Strong Performance
  • Access Women Network, Evolve Charity Trust Partner To Support Girls In 12 States
  • Access Holdings Announces Bamisebi’s Exit After Contract Expiration
  • FG Targets 125,000km Fibre Network, 200,000 Public Institutions By 2028
  • GOCOP 2026: Sydney-Jack Demands Greater Women’s Inclusion In Nigeria’s Electoral Process
  • Maida Charges NCC Staff To Prioritise Stakeholder Satisfaction, Service Excellence
  • FAAN Announces 25-Day Closure Of Owerri Airport Runway
Facebook X (Twitter) Instagram
Digital Times NigeriaDigital Times Nigeria
  • Home
  • Telecoms
    • Broadband
  • Business
    • Banking
    • Finance
  • Editorial
    • Opinion
    • Big Story
  • TechExtra
    • Fintech
    • Innovation
  • Interview
  • Media
    • Social
    • Broadcasting
Digital Times Nigeria
Home » Major Fault On Omotoso-Ikeja Transmission Line Cause Of Lagos Power Supply Drop- TCN
ENERGY

Major Fault On Omotoso-Ikeja Transmission Line Cause Of Lagos Power Supply Drop- TCN

Our REPORTERBy Our REPORTER12 March 2025No Comments1 Min Read148 Views
Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
Power supply
Share
Facebook Twitter LinkedIn Pinterest Telegram Email WhatsApp

The Transmission Company of Nigeria (TCN) has confirmed a significant reduction in electricity supply to Lagos following a major fault on its Omotoso-Ikeja West 330-kilovolt (kV) transmission line.

In a statement on Tuesday, TCN’s General Manager of Public Affairs, Ndidi Mbah, disclosed that the transmission line snapped between towers 420 and 422 on March 9, leading to a loss of approximately 350 megawatts (MW) of bulk electricity supply to the state.

The outage has impacted both Eko Electricity Distribution Company (EKEDC) and Ikeja Electricity Distribution Company (IKEDC), resulting in widespread load shedding across their franchise areas.

To address the situation, TCN has dispatched engineers to the site and mobilized necessary materials for repairs.

According to Mbah, the restoration process is expected to be completed within three days, after which full bulk power supply will resume through the affected transmission route.

Mbah apologized for the inconvenience caused to the government, electricity distribution companies, and consumers in Lagos, assuring them of TCN’s commitment to resolving the issue as swiftly as possible.

READ ALSO  Stakeholders Demand Pragmatic Action For Sustainable Energy Transition
#Electricity #Power Supply #TCN
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleSeplat Energy, Zinox Technologies In Strategic Tech Partnership
Next Article Customs’ B’Odogwu Platform Generates Over N150 Billion In Four Months- Compt. Daniyan
Our REPORTER
  • Website

Comments are closed.

Categories
About
About

Digital Times Nigeria (www.digitaltimesng.com) is an online technology publication of Digital Times Media Services.

Facebook X (Twitter) Instagram
Latest Posts

PalmPay Wins Digital Payments Platform Of The Year At 2026 BAFI Awards

13 October 2026

Shareholders Commend Fidelity Bank’s Strong Performance

12 October 2026

Access Women Network, Evolve Charity Trust Partner To Support Girls In 12 States

12 October 2026
Popular Posts

Building Explainable AI (XAI) Dashboards For Non-Technical Stakeholders

2 May 2022

Building Ethical AI Starts With People: How Gabriel Ayodele Is Engineering Trust Through Mentorship

8 January 2024

Gabriel Tosin Ayodele: Leading AI-Powered Innovation In Web3

8 November 2022
© 2026 Digital Times NG.
  • Advert Rate
  • Terms of Use
  • Advertisement
  • Private Policy
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.