Digital Times Nigeria
  • Home
  • Telecoms
    • Broadband
  • Business
    • Banking
    • Finance
  • Editorial
    • Opinion
    • Big Story
  • TechExtra
    • Fintech
    • Innovation
  • Interview
  • Media
    • Social
    • Broadcasting
Facebook X (Twitter) Instagram
Trending
  • These Are 6 Easy Ways To Enjoy The 2026 World Cup With Google And Gemini
  • NITDA Pushes For Digital Sovereignty, Responsible AI Adoption
  • Phase3 Telecom Reaffirms Commitment To Expanding Broadband Access, Backs Credible Journalism
  • Fiona Ahmed Ahimie Launches LeadHER Mentorship Initiative Ahead Of Historic Investiture
  • Access Bank Launches Auto Fest To Transform Vehicle Ownership In Nigeria
  • When Leaders THRIVE: Yetunde B. Oni’s Candid Counsel To The Lateef Jakande Leadership Academy
  • Fidelity Bank Partners Anambra State To Empower 1,950 Nigerians
  • NITDA, TikTok Partner To Boost Digital Commerce Skills For Nigerian SMEs
Facebook X (Twitter) Instagram
Digital Times NigeriaDigital Times Nigeria
  • Home
  • Telecoms
    • Broadband
  • Business
    • Banking
    • Finance
  • Editorial
    • Opinion
    • Big Story
  • TechExtra
    • Fintech
    • Innovation
  • Interview
  • Media
    • Social
    • Broadcasting
Digital Times Nigeria
Home » Major Fault On Omotoso-Ikeja Transmission Line Cause Of Lagos Power Supply Drop- TCN
ENERGY

Major Fault On Omotoso-Ikeja Transmission Line Cause Of Lagos Power Supply Drop- TCN

Our REPORTERBy Our REPORTER12 March 2025No Comments1 Min Read147 Views
Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
Power supply
Share
Facebook Twitter LinkedIn Pinterest Telegram Email WhatsApp

The Transmission Company of Nigeria (TCN) has confirmed a significant reduction in electricity supply to Lagos following a major fault on its Omotoso-Ikeja West 330-kilovolt (kV) transmission line.

In a statement on Tuesday, TCN’s General Manager of Public Affairs, Ndidi Mbah, disclosed that the transmission line snapped between towers 420 and 422 on March 9, leading to a loss of approximately 350 megawatts (MW) of bulk electricity supply to the state.

The outage has impacted both Eko Electricity Distribution Company (EKEDC) and Ikeja Electricity Distribution Company (IKEDC), resulting in widespread load shedding across their franchise areas.

To address the situation, TCN has dispatched engineers to the site and mobilized necessary materials for repairs.

According to Mbah, the restoration process is expected to be completed within three days, after which full bulk power supply will resume through the affected transmission route.

Mbah apologized for the inconvenience caused to the government, electricity distribution companies, and consumers in Lagos, assuring them of TCN’s commitment to resolving the issue as swiftly as possible.

READ ALSO  Zinox Boss Warns Poor Power Supply Is Crippling Nigeria’s Knowledge Economy
#Electricity #Power Supply #TCN
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleSeplat Energy, Zinox Technologies In Strategic Tech Partnership
Next Article Customs’ B’Odogwu Platform Generates Over N150 Billion In Four Months- Compt. Daniyan
Our REPORTER
  • Website

Comments are closed.

Categories
About
About

Digital Times Nigeria (www.digitaltimesng.com) is an online technology publication of Digital Times Media Services.

Facebook X (Twitter) Instagram
Latest Posts

These Are 6 Easy Ways To Enjoy The 2026 World Cup With Google And Gemini

25 June 2026

NITDA Pushes For Digital Sovereignty, Responsible AI Adoption

25 June 2026

Phase3 Telecom Reaffirms Commitment To Expanding Broadband Access, Backs Credible Journalism

25 June 2026
Popular Posts

Building Explainable AI (XAI) Dashboards For Non-Technical Stakeholders

2 May 2022

Building Ethical AI Starts With People: How Gabriel Ayodele Is Engineering Trust Through Mentorship

8 January 2024

Gabriel Tosin Ayodele: Leading AI-Powered Innovation In Web3

8 November 2022
© 2026 Digital Times NG.
  • Advert Rate
  • Terms of Use
  • Advertisement
  • Private Policy
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.